Addition of new 13,000 square foot gym space with accessible restrooms adjacent to existing sports fields
Renovation of existing Girls and Boys sport/gym class locker rooms including new lockers, equipment storage, upgraded restrooms, and additional changing areas
Installation of new pool dehumidification system , and resurfacing of the interior of the existing pool
SHS Gym Addition Rendering
SHS Gym Addition Rendering
SHS Gym Addition Rendering
SHS Gym Addition Floor Plan
SHS New Library Rendering
SHS New Library Rendering
SHS Robotics Lab relocation and renovation
SHS Robotics Lab relocation and renovation
Academics
Addition of new library with large collaboration spaces and group study areas
Conversion of existing library back to classrooms to provide additional instructional space
Relocation and expansion of Guidance suite to create a dedicated mental health suite with centralized guidance, counseling, and psychological services to improve student privacy and support
Relocation of Robotics Lab to larger space with higher ceilings to allow for expanded curriculum using drones
Expansion of existing science research lab classrooms to accommodate increased student enrollment in science research courses
Safety Improvements
Creation of a bus loop in the back of the high school building to allow for additional staging of buses at dismissal to improve traffic on South Woods Road and improve on-time performance for middle and elementary bus routes
Building security enhancements, including window reinforcements
Infrastructure Improvements Identified by Architectural Inspections
Replace 20,000 square feet of roof
Masonry replacement, repointing, and repairs to keep building watertight