H.B. Thompson Middle School
Proposition 1 Scope of Work
Addition of main entrance vestibule to improve building safety, and allow for more efficient entry and exit
Current HBT Vestibule
Proposed HBT Vestibule
Athletics
-
Installation of air conditioning in existing gym space
-
Installation of outdoor track on main field with grass infield so both middle schools have access to a running track
(If Proposition 2 is adopted, the infield will be upgraded to turf.) -
Renovation of Girls and Boys locker rooms including new lockers, equipment storage, upgraded restrooms, and additional changing areas
Safety Improvements
-
Building security enhancements, including window reinforcements
Infrastructure Improvements Identified by Architectural Inspections
-
Masonry replacement, repointing, and repairs to keep building watertight
-
Replacement of existing asphalt paving, concrete sidewalks, and curbs
H.B. Thompson floor plan with proposed additions
Proposition 2 Scope of Work
Installation of turf infield in the center of the new track